A case study demonstrating how a manufacturer's modelling and shop drawing processes can be automated using mass customisation.
This article rethinks BIM 1.0's processes, which focuses on standardisation, and postulates how it can evolve to BIM 2.0 via systematisation.
This case study highlights how mass timber construction sequencing can be captured and codified in Dynamo to achieve automation at scale.
As organisations turn to automated solutions to streamline their workflows, greater consistency is needed to reap the benefit of these tools.